AIM RAC 3.11 CLOSING A FLIGHT PLAN
In order to comply with CAR 602.77, an arrival report for a flight plan shall be submitted to an ATC unit, an FSS (or a FIC) or a CARS as soon as practicable after landing but not later than:
(a) the SAR time specified in the flight plan; or
(b) where no SAR time is specified in the flight plan, one hour after the last reported ETA.
A pilot who terminates a flight itinerary shall ensure that an arrival report is filed with an ATC unit, an FSS (or a FIC), a CARS or, where the flight itinerary was filed with a responsible person, the responsible person as soon as practicable after landing but not later than:
(a) the SAR time specified in the flight itinerary; or
(b) where no SAR time was specified in the flight itinerary, 24 hours after the last reported ETA.
A pilot who terminates an IFR flight at an aerodrome where there is an operating ATC unit, FSS or where RAAS is provided, is not required to file an arrival report unless requested to do so by the appropriate ATC unit or FSS.
When submitting an arrival report, the pilot should clearly indicate that he/she was operating on a flight plan or flight itinerary and wishes it to be closed. Failure to close a flight plan or flight itinerary will initiate SAR action. It should not be assumed that ATS personnel will automatically file arrival reports for VFR flights at locations served by control towers and FSSs or an RCO. Toll-free calls, as outlined in the CFS, may be made to an ATS facility for this purpose.
CAR 602.70 Flight Preparation, Flight Plans and Flight Itineraries
602.70 In this Division, overdue, in respect of an aircraft, means an aircraft for which an arrival report has not been filed
(a) where a flight plan has been filed in respect of the aircraft,
(i) if a search and rescue notification time is specified in the flight plan, immediately after the last reported such time, or
(ii) in all other cases, within one hour after the last reported estimated time of arrival, or
(b) where a flight itinerary has been filed in respect of the aircraft,
(i) if a search and rescue notification time is specified in the flight itinerary, immediately after the last reported such time, or
(ii) in all other cases, within 24 hours after the last reported estimated time of arrival; (en retard)
responsible person means an individual who has agreed with the person who has filed a flight itinerary to ensure that the following are notified in the manner prescribed in this Division, if the aircraft is overdue, namely,
(a) an air traffic control unit, a flight service station or a community aerodrome radio station, or
(b) a Rescue Co-ordination Centre. (personne de confiance)
AIM RAC 3.11 CLOSING A FLIGHT PLAN
In order to comply with CAR 602.77, an arrival report for a flight plan shall be submitted to an ATC unit, an FSS (or a FIC) or a CARS as soon as practicable after landing but not later than:
(a) the SAR time specified in the flight plan; or
(b) where no SAR time is specified in the flight plan, one hour after the last reported ETA.
A pilot who terminates a flight itinerary shall ensure that an arrival report is filed with an ATC unit, an FSS (or a FIC), a CARS or, where the flight itinerary was filed with a responsible person, the responsible person as soon as practicable after landing but not later than:
(a) the SAR time specified in the flight itinerary; or
(b) where no SAR time was specified in the flight itinerary, 24 hours after the last reported ETA.
A pilot who terminates an IFR flight at an aerodrome where there is an operating ATC unit, FSS or where RAAS is provided, is not required to file an arrival report unless requested to do so by the appropriate ATC unit or FSS.
When submitting an arrival report, the pilot should clearly indicate that he/she was operating on a flight plan or flight itinerary and wishes it to be closed. Failure to close a flight plan or flight itinerary will initiate SAR action. It should not be assumed that ATS personnel will automatically file arrival reports for VFR flights at locations served by control towers and FSSs or an RCO. Toll-free calls, as outlined in the CFS, may be made to an ATS facility for this purpose.
CAR 602.70 Flight Preparation, Flight Plans and Flight Itineraries
602.70 In this Division, overdue, in respect of an aircraft, means an aircraft for which an arrival report has not been filed
(a) where a flight plan has been filed in respect of the aircraft,
(i) if a search and rescue notification time is specified in the flight plan, immediately after the last reported such time, or
(ii) in all other cases, within one hour after the last reported estimated time of arrival, or
(b) where a flight itinerary has been filed in respect of the aircraft,
(i) if a search and rescue notification time is specified in the flight itinerary, immediately after the last reported such time, or
(ii) in all other cases, within 24 hours after the last reported estimated time of arrival; (en retard)
responsible person means an individual who has agreed with the person who has filed a flight itinerary to ensure that the following are notified in the manner prescribed in this Division, if the aircraft is overdue, namely,
(a) an air traffic control unit, a flight service station or a community aerodrome radio station, or
(b) a Rescue Co-ordination Centre. (personne de confiance)